Data Center Construction Market is expected to see potential upside in years to come. The assessment aims are to provide a viewpoint on upcoming trends, growth drivers, opinions, and facts derived from industry executives with statistically supported and market validated data. Furthermore, details on How or Why this market may see a growth momentum during the forecast period is analyzed and correlated with dominating and emerging players strength and weakness.
The Study also encompasses COVID-19 Outbreak & Impact Analysis, how Data Center Construction Industry would develop, and what business strategies industry players are considering to overcome challenges. A holistic study of the Data Center Construction market is made by considering a variety of factors, from demographics conditions and business cycles in a particular country to market-specific microeconomic impacts. The analysis found the shift in market paradigms in terms of the local and global competitive edge of major players.
Data Center Construction Market Scope
Data Center Construction market is segmented on the basis of type (
Market Data Breakdown and Growth Pattern by Type
<>
Market Data Breakdown and Growth Pattern by End-Use Industry / Applications
<>
Competitive Landscape
In the competitive analysis section of the
Players Profiled in the Data Center Construction Market Study
<>
Regional Landscape & Analysis
North America Country (United States, Canada)
South America (Brazil, Argentina, Chile, Rest of South America)
Asia-Pacific (China, Japan, India, South Korea, Australia, Singapore, Malaysia, Indonesia, Thailand, Philippines, Others)
Europe (Germany, United Kingdom, France, Italy, Spain, Switzerland, Netherlands, Sweden, Baltic, rest of Europe)
Rest of World [The United Arab Emirates, Saudi Arabia (KSA), South Africa, Turkey, Israel, Others]
Overall, the Data Center Construction Market report is a reliable source for managers, analysts, and executives from the industry to better analyze market scenarios from a third-party research perspective. Market Intellix aims to bridge the gap between businesses and end customers to better elaborate manufacturers with benefits, limits, trends, and market growth rates. SWOT analysis is also incorporated in the Data Center Construction market report in line with speculation attainability investigation and venture return investigation.
Table of Content
1 Data Center Construction Introduction and Market Overview
1.1 Objectives of the Study
1.2 Overview of Data Center Construction
1.3 Scope of The Study
1.3.1 Key Market Segments
1.3.2 Players Covered
1.3.3 COVID-19's impact on the Data Center Construction industry
1.4 Methodology of The Study
1.5 Research Data Source
2 Executive Summary
2.1 Market Overview
2.1.1 Global Data Center Construction Market Size, 2015 – 2020
2.1.2 Global Data Center Construction Market Size by Type, 2015 – 2020
2.1.3 Global Data Center Construction Market Size by Application, 2015 – 2020
2.1.4 Global Data Center Construction Market Size by Region, 2015 - 2025
2.2 Business Environment Analysis
2.2.1 Global COVID-19 Status and Economic Overview
2.2.2 Influence of COVID-19 Outbreak on Data Center Construction Industry Development
3 Industry Chain Analysis
3.1 Upstream Raw Material Suppliers of Data Center Construction Analysis
3.2 Major Players of Data Center Construction
3.3 Data Center Construction Manufacturing Cost Structure Analysis
3.3.1 Production Process Analysis
3.3.2 Manufacturing Cost Structure of Data Center Construction
3.3.3 Labor Cost of Data Center Construction
3.4 Market Distributors of Data Center Construction
3.5 Major Downstream Buyers of Data Center Construction Analysis
3.6 The Impact of Covid-19 From the Perspective of Industry Chain
3.7 Regional Import and Export Controls Will Exist for a Long Time
3.8 Continued downward PMI Spreads Globally
4 Global Data Center Construction Market, by Type
4.1 Global Data Center Construction Value and Market Share by Type (2015-2020)
4.2 Global Data Center Construction Production and Market Share by Type (2015-2020)
4.3 Global Data Center Construction Value and Growth Rate by Type (2015-2020)
4.3.1 Global Data Center Construction Value and Growth Rate of Electrical Construction
4.3.2 Global Data Center Construction Value and Growth Rate of Mechanical Construction
4.3.3 Global Data Center Construction Value and Growth Rate of General Construction
4.4 Global Data Center Construction Price Analysis by Type (2015-2020)
5 Data Center Construction Market, by Application
5.1 Downstream Market Overview
5.2 Global Data Center Construction Consumption and Market Share by Application (2015-2020)
5.3 Global Data Center Construction Consumption and Growth Rate by Application (2015-2020)
5.3.1 Global Data Center Construction Consumption and Growth Rate of Finance (2015-2020)
5.3.2 Global Data Center Construction Consumption and Growth Rate of Internet (2015-2020)
5.3.3 Global Data Center Construction Consumption and Growth Rate of Telecommunications (2015-2020)
5.3.4 Global Data Center Construction Consumption and Growth Rate of Government (2015-2020)
5.3.5 Global Data Center Construction Consumption and Growth Rate of Others (2015-2020)
6 Global Data Center Construction Market Analysis by Regions
6.1 Global Data Center Construction Sales, Revenue and Market Share by Regions
6.1.1 Global Data Center Construction Sales by Regions (2015-2020)
6.1.2 Global Data Center Construction Revenue by Regions (2015-2020)
6.2 North America Data Center Construction Sales and Growth Rate (2015-2020)
6.3 Europe Data Center Construction Sales and Growth Rate (2015-2020)
6.4 Asia-Pacific Data Center Construction Sales and Growth Rate (2015-2020)
6.5 Middle East and Africa Data Center Construction Sales and Growth Rate (2015-2020)
6.6 South America Data Center Construction Sales and Growth Rate (2015-2020)
7 North America Data Center Construction Market Analysis by Countries
7.1 The Influence of COVID-19 on North America Market
7.2 North America Data Center Construction Sales, Revenue and Market Share by Countries
7.2.1 North America Data Center Construction Sales by Countries (2015-2020)
7.2.2 North America Data Center Construction Revenue by Countries (2015-2020)
7.3 United States Data Center Construction Sales and Growth Rate (2015-2020)
7.4 Canada Data Center Construction Sales and Growth Rate (2015-2020)
7.5 Mexico Data Center Construction Sales and Growth Rate (2015-2020)
8 Europe Data Center Construction Market Analysis by Countries
8.1 The Influence of COVID-19 on Europe Market
8.2 Europe Data Center Construction Sales, Revenue and Market Share by Countries
8.2.1 Europe Data Center Construction Sales by Countries (2015-2020)
8.2.2 Europe Data Center Construction Revenue by Countries (2015-2020)
8.3 Germany Data Center Construction Sales and Growth Rate (2015-2020)
8.4 UK Data Center Construction Sales and Growth Rate (2015-2020)
8.5 France Data Center Construction Sales and Growth Rate (2015-2020)
8.6 Italy Data Center Construction Sales and Growth Rate (2015-2020)
8.7 Spain Data Center Construction Sales and Growth Rate (2015-2020)
8.8 Russia Data Center Construction Sales and Growth Rate (2015-2020)
9 Asia Pacific Data Center Construction Market Analysis by Countries
9.1 The Influence of COVID-19 on Asia Pacific Market
9.2 Asia Pacific Data Center Construction Sales, Revenue and Market Share by Countries
9.2.1 Asia Pacific Data Center Construction Sales by Countries (2015-2020)
9.2.2 Asia Pacific Data Center Construction Revenue by Countries (2015-2020)
9.3 China Data Center Construction Sales and Growth Rate (2015-2020)
9.4 Japan Data Center Construction Sales and Growth Rate (2015-2020)
9.5 South Korea Data Center Construction Sales and Growth Rate (2015-2020)
9.6 India Data Center Construction Sales and Growth Rate (2015-2020)
9.7 Southeast Asia Data Center Construction Sales and Growth Rate (2015-2020)
9.8 Australia Data Center Construction Sales and Growth Rate (2015-2020)
10 Middle East and Africa Data Center Construction Market Analysis by Countries
10.1 The Influence of COVID-19 on Middle East and Africa Market
10.2 Middle East and Africa Data Center Construction Sales, Revenue and Market Share by Countries
10.2.1 Middle East and Africa Data Center Construction Sales by Countries (2015-2020)
10.2.2 Middle East and Africa Data Center Construction Revenue by Countries (2015-2020)
10.3 Saudi Arabia Data Center Construction Sales and Growth Rate (2015-2020)
10.4 UAE Data Center Construction Sales and Growth Rate (2015-2020)
10.5 Egypt Data Center Construction Sales and Growth Rate (2015-2020)
10.6 Nigeria Data Center Construction Sales and Growth Rate (2015-2020)
10.7 South Africa Data Center Construction Sales and Growth Rate (2015-2020)
11 South America Data Center Construction Market Analysis by Countries
11.1 The Influence of COVID-19 on Middle East and Africa Market
11.2 South America Data Center Construction Sales, Revenue and Market Share by Countries
11.2.1 South America Data Center Construction Sales by Countries (2015-2020)
11.2.2 South America Data Center Construction Revenue by Countries (2015-2020)
11.3 Brazil Data Center Construction Sales and Growth Rate (2015-2020)
11.4 Argentina Data Center Construction Sales and Growth Rate (2015-2020)
11.5 Columbia Data Center Construction Sales and Growth Rate (2015-2020)
11.6 Chile Data Center Construction Sales and Growth Rate (2015-2020)
12 Competitive Landscape
12.1 ISG Construction
12.1.1 ISG Construction Basic Information
12.1.2 Data Center Construction Product Introduction
12.1.3 ISG Construction Production, Value, Price, Gross Margin 2015-2020
12.2 Hensel Phelps
12.2.1 Hensel Phelps Basic Information
12.2.2 Data Center Construction Product Introduction
12.2.3 Hensel Phelps Production, Value, Price, Gross Margin 2015-2020
12.3 Mortenson Construction
12.3.1 Mortenson Construction Basic Information
12.3.2 Data Center Construction Product Introduction
12.3.3 Mortenson Construction Production, Value, Price, Gross Margin 2015-2020
12.4 Whiting-Turner Contracting Co
12.4.1 Whiting-Turner Contracting Co Basic Information
12.4.2 Data Center Construction Product Introduction
12.4.3 Whiting-Turner Contracting Co Production, Value, Price, Gross Margin 2015-2020
12.5 Structure Tone.
12.5.1 Structure Tone. Basic Information
12.5.2 Data Center Construction Product Introduction
12.5.3 Structure Tone. Production, Value, Price, Gross Margin 2015-2020
12.6 Aceco TI
12.6.1 Aceco TI Basic Information
12.6.2 Data Center Construction Product Introduction
12.6.3 Aceco TI Production, Value, Price, Gross Margin 2015-2020
12.7 Turner Construction Co.
12.7.1 Turner Construction Co. Basic Information
12.7.2 Data Center Construction Product Introduction
12.7.3 Turner Construction Co. Production, Value, Price, Gross Margin 2015-2020
12.8 Cisco
12.8.1 Cisco Basic Information
12.8.2 Data Center Construction Product Introduction
12.8.3 Cisco Production, Value, Price, Gross Margin 2015-2020
12.9 HITT Contracting
12.9.1 HITT Contracting Basic Information
12.9.2 Data Center Construction Product Introduction
12.9.3 HITT Contracting Production, Value, Price, Gross Margin 2015-2020
12.10 Corgan Associates
12.10.1 Corgan Associates Basic Information
12.10.2 Data Center Construction Product Introduction
12.10.3 Corgan Associates Production, Value, Price, Gross Margin 2015-2020
12.11 Arup Group
12.11.1 Arup Group Basic Information
12.11.2 Data Center Construction Product Introduction
12.11.3 Arup Group Production, Value, Price, Gross Margin 2015-2020
12.12 Fortis Construction
12.12.1 Fortis Construction Basic Information
12.12.2 Data Center Construction Product Introduction
12.12.3 Fortis Construction Production, Value, Price, Gross Margin 2015-2020
12.13 HDR Architecture
12.13.1 HDR Architecture Basic Information
12.13.2 Data Center Construction Product Introduction
12.13.3 HDR Architecture Production, Value, Price, Gross Margin 2015-2020
12.14 JE Dunn Construction
12.14.1 JE Dunn Construction Basic Information
12.14.2 Data Center Construction Product Introduction
12.14.3 JE Dunn Construction Production, Value, Price, Gross Margin 2015-2020
12.15 DPR Construction
12.15.1 DPR Construction Basic Information
12.15.2 Data Center Construction Product Introduction
12.15.3 DPR Construction Production, Value, Price, Gross Margin 2015-2020
12.16 Equinix
12.16.1 Equinix Basic Information
12.16.2 Data Center Construction Product Introduction
12.16.3 Equinix Production, Value, Price, Gross Margin 2015-2020
12.17 Holder Construction Company
12.17.1 Holder Construction Company Basic Information
12.17.2 Data Center Construction Product Introduction
12.17.3 Holder Construction Company Production, Value, Price, Gross Margin 2015-2020
13 Industry Outlook
13.1 Market Driver Analysis
13.1.2 Market Restraints Analysis
13.1.3 Market Trends Analysis
13.2 Merger, Acquisition and New Investment
13.3 News of Product Release
14 Global Data Center Construction Market Forecast
14.1 Global Data Center Construction Market Value & Volume Forecast, by Type (2020-2025)
14.1.1 Electrical Construction Market Value and Volume Forecast (2020-2025)
14.1.2 Mechanical Construction Market Value and Volume Forecast (2020-2025)
14.1.3 General Construction Market Value and Volume Forecast (2020-2025)
14.2 Global Data Center Construction Market Value & Volume Forecast, by Application (2020-2025)
14.2.1 Finance Market Value and Volume Forecast (2020-2025)
14.2.2 Internet Market Value and Volume Forecast (2020-2025)
14.2.3 Telecommunications Market Value and Volume Forecast (2020-2025)
14.2.4 Government Market Value and Volume Forecast (2020-2025)
14.2.5 Others Market Value and Volume Forecast (2020-2025)
14.3 Data Center Construction Market Analysis and Forecast by Region
14.3.1 North America Market Value and Consumption Forecast (2020-2025)
14.3.2 Europe Market Value and Consumption Forecast (2020-2025)
14.3.3 Asia Pacific Market Value and Consumption Forecast (2020-2025)
14.3.4 Middle East and Africa Market Value and Consumption Forecast (2020-2025)
14.3.5 South America Market Value and Consumption Forecast (2020-2025)
15 New Project Feasibility Analysis
15.1 Industry Barriers and New Entrants SWOT Analysis
15.1.1 Porter’s Five Forces Analysis
15.1.2 New Entrants SWOT Analysis
15.2 Analysis and Suggestions on New Project Investment
List of Tables and Figures
Figure Product Picture of Data Center Construction
Table Product Specification of Data Center Construction
Table Data Center Construction Key Market Segments
Table Key Players Data Center Construction Covered
Figure Global Data Center Construction Market Size, 2015 – 2025
Table Different Types of Data Center Construction
Figure Global Data Center Construction Value ($) Segment by Type from 2015-2020
Figure Global Data Center Construction Market Share by Types in 2019
Table Different Applications of Data Center Construction
Figure Global Data Center Construction Value ($) Segment by Applications from 2015-2020
Figure Global Data Center Construction Market Share by Applications in 2019
Figure Global Data Center Construction Market Share by Regions in 2019
Figure North America Data Center Construction Production Value ($) and Growth Rate (2015-2020)
Figure Europe Data Center Construction Production Value ($) and Growth Rate (2015-2020)
Figure Asia Pacific Data Center Construction Production Value ($) and Growth Rate (2015-2020)
Figure Middle East and Africa Data Center Construction Production Value ($) and Growth Rate (2015-2020)
Figure South America Data Center Construction Production Value ($) and Growth Rate (2015-2020)
Table Global COVID-19 Status and Economic Overview
Figure Global COVID-19 Status
Figure COVID-19 Comparison of Major Countries
Figure Industry Chain Analysis of Data Center Construction
Table Upstream Raw Material Suppliers of Data Center Construction with Contact Information
Table Major Players Headquarters, and Service Area of Data Center Construction
Figure Major Players Production Value Market Share of Data Center Construction in 2019
Table Major Players Data Center Construction Product Types in 2019
Figure Production Process of Data Center Construction
Figure Manufacturing Cost Structure of Data Center Construction
Figure Channel Status of Data Center Construction
Table Major Distributors of Data Center Construction with Contact Information
Table Major Downstream Buyers of Data Center Construction with Contact Information
Table Global Data Center Construction Value ($) by Type (2015-2020)
Table Global Data Center Construction Value Share by Type (2015-2020)
Figure Global Data Center Construction Value Share by Type (2015-2020)
Table Global Data Center Construction Production by Type (2015-2020)
Table Global Data Center Construction Production Share by Type (2015-2020)
Figure Global Data Center Construction Production Share by Type (2015-2020)
Figure Global Data Center Construction Value ($) and Growth Rate of Electrical Construction (2015-2020)
Figure Global Data Center Construction Value ($) and Growth Rate of Mechanical Construction (2015-2020)
Figure Global Data Center Construction Value ($) and Growth Rate of General Construction (2015-2020)
Figure Global Data Center Construction Price by Type (2015-2020)
Figure Downstream Market Overview
Table Global Data Center Construction Consumption by Application (2015-2020)
Table Global Data Center Construction Consumption Market Share by Application (2015-2020)
Figure Global Data Center Construction Consumption Market Share by Application (2015-2020)
Figure Global Data Center Construction Consumption and Growth Rate of Finance (2015-2020)
Figure Global Data Center Construction Consumption and Growth Rate of Internet (2015-2020)
Figure Global Data Center Construction Consumption and Growth Rate of Telecommunications (2015-2020)
Figure Global Data Center Construction Consumption and Growth Rate of Government (2015-2020)
Figure Global Data Center Construction Consumption and Growth Rate of Others (2015-2020)
Figure Global Data Center Construction Sales and Growth Rate (2015-2020)
Figure Global Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table Global Data Center Construction Sales by Regions (2015-2020)
Table Global Data Center Construction Sales Market Share by Regions (2015-2020)
Table Global Data Center Construction Revenue (M USD) by Regions (2015-2020)
Table Global Data Center Construction Revenue Market Share by Regions (2015-2020)
Table Global Data Center Construction Revenue Market Share by Regions in 2015
Table Global Data Center Construction Revenue Market Share by Regions in 2019
Figure North America Data Center Construction Sales and Growth Rate (2015-2020)
Figure Europe Data Center Construction Sales and Growth Rate (2015-2020)
Figure Asia-Pacific Data Center Construction Sales and Growth Rate (2015-2020)
Figure Middle East and Africa Data Center Construction Sales and Growth Rate (2015-2020)
Figure South America Data Center Construction Sales and Growth Rate (2015-2020)
Figure North America COVID-19 Status
Figure North America COVID-19 Confirmed Cases Major Distribution
Figure North America Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table North America Data Center Construction Sales by Countries (2015-2020)
Table North America Data Center Construction Sales Market Share by Countries (2015-2020)
Table North America Data Center Construction Revenue (M USD) by Countries (2015-2020)
Table North America Data Center Construction Revenue Market Share by Countries (2015-2020)
Figure United States Data Center Construction Sales and Growth Rate (2015-2020)
Figure Canada Data Center Construction Sales and Growth Rate (2015-2020)
Figure Mexico Data Center Construction Sales and Growth (2015-2020)
Figure Europe COVID-19 Status
Figure Europe COVID-19 Confirmed Cases Major Distribution
Figure Europe Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table Europe Data Center Construction Sales by Countries (2015-2020)
Table Europe Data Center Construction Sales Market Share by Countries (2015-2020)
Table Europe Data Center Construction Revenue (M USD) by Countries (2015-2020)
Table Europe Data Center Construction Revenue Market Share by Countries (2015-2020)
Figure Germany Data Center Construction Sales and Growth Rate (2015-2020)
Figure UK Data Center Construction Sales and Growth Rate (2015-2020)
Figure France Data Center Construction Sales and Growth (2015-2020)
Figure Italy Data Center Construction Sales and Growth (2015-2020)
Figure Spain Data Center Construction Sales and Growth (2015-2020)
Figure Russia Data Center Construction Sales and Growth (2015-2020)
Figure Asia Pacific COVID-19 Status
Figure Asia Pacific Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table Asia Pacific Data Center Construction Sales by Countries (2015-2020)
Table Asia Pacific Data Center Construction Sales Market Share by Countries (2015-2020)
Table Asia Pacific Data Center Construction Revenue (M USD) by Countries (2015-2020)
Table Asia Pacific Data Center Construction Revenue Market Share by Countries (2015-2020)
Figure China Data Center Construction Sales and Growth Rate (2015-2020)
Figure Japan Data Center Construction Sales and Growth Rate (2015-2020)
Figure South Korea Data Center Construction Sales and Growth (2015-2020)
Figure India Data Center Construction Sales and Growth (2015-2020)
Figure Southeast Asia Data Center Construction Sales and Growth (2015-2020)
Figure Australia Data Center Construction Sales and Growth (2015-2020)
Figure Middle East Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table Middle East Data Center Construction Sales by Countries (2015-2020)
Table Middle East and Africa Data Center Construction Sales Market Share by Countries (2015-2020)
Table Middle East and Africa Data Center Construction Revenue (M USD) by Countries (2015-2020)
Table Middle East and Africa Data Center Construction Revenue Market Share by Countries (2015-2020)
Figure Saudi Arabia Data Center Construction Sales and Growth Rate (2015-2020)
Figure UAE Data Center Construction Sales and Growth Rate (2015-2020)
Figure Egypt Data Center Construction Sales and Growth (2015-2020)
Figure Nigeria Data Center Construction Sales and Growth (2015-2020)
Figure South Africa Data Center Construction Sales and Growth (2015-2020)
Figure South America Data Center Construction Revenue (M USD) and Growth (2015-2020)
Table South America Data Center Construction Sales by Countries (2015-2020)
Table South America Data Center Construction Sales Market Share by Countries (2015-2020)
Table South America Data Center Construction Revenue (M USD) by Countries (2015-2020)
Table South America Data Center Construction Revenue Market Share by Countries (2015-2020)
Figure Brazil Data Center Construction Sales and Growth Rate (2015-2020)
Figure Argentina Data Center Construction Sales and Growth Rate (2015-2020)
Figure Columbia Data Center Construction Sales and Growth (2015-2020)
Figure Chile Data Center Construction Sales and Growth (2015-2020)
Figure Top 3 Market Share of Data Center Construction Companies in 2019
Figure Top 6 Market Share of Data Center Construction Companies in 2019
Table Major Players Production Value ($) Share (2015-2020)
Table ISG Construction Profile
Table ISG Construction Product Introduction
Figure ISG Construction Production and Growth Rate
Figure ISG Construction Value ($) Market Share 2015-2020
Table Hensel Phelps Profile
Table Hensel Phelps Product Introduction
Figure Hensel Phelps Production and Growth Rate
Figure Hensel Phelps Value ($) Market Share 2015-2020
Table Mortenson Construction Profile
Table Mortenson Construction Product Introduction
Figure Mortenson Construction Production and Growth Rate
Figure Mortenson Construction Value ($) Market Share 2015-2020
Table Whiting-Turner Contracting Co Profile
Table Whiting-Turner Contracting Co Product Introduction
Figure Whiting-Turner Contracting Co Production and Growth Rate
Figure Whiting-Turner Contracting Co Value ($) Market Share 2015-2020
Table Structure Tone. Profile
Table Structure Tone. Product Introduction
Figure Structure Tone. Production and Growth Rate
Figure Structure Tone. Value ($) Market Share 2015-2020
Table Aceco TI Profile
Table Aceco TI Product Introduction
Figure Aceco TI Production and Growth Rate
Figure Aceco TI Value ($) Market Share 2015-2020
Table Turner Construction Co. Profile
Table Turner Construction Co. Product Introduction
Figure Turner Construction Co. Production and Growth Rate
Figure Turner Construction Co. Value ($) Market Share 2015-2020
Table Cisco Profile
Table Cisco Product Introduction
Figure Cisco Production and Growth Rate
Figure Cisco Value ($) Market Share 2015-2020
Table HITT Contracting Profile
Table HITT Contracting Product Introduction
Figure HITT Contracting Production and Growth Rate
Figure HITT Contracting Value ($) Market Share 2015-2020
Table Corgan Associates Profile
Table Corgan Associates Product Introduction
Figure Corgan Associates Production and Growth Rate
Figure Corgan Associates Value ($) Market Share 2015-2020
Table Arup Group Profile
Table Arup Group Product Introduction
Figure Arup Group Production and Growth Rate
Figure Arup Group Value ($) Market Share 2015-2020
Table Fortis Construction Profile
Table Fortis Construction Product Introduction
Figure Fortis Construction Production and Growth Rate
Figure Fortis Construction Value ($) Market Share 2015-2020
Table HDR Architecture Profile
Table HDR Architecture Product Introduction
Figure HDR Architecture Production and Growth Rate
Figure HDR Architecture Value ($) Market Share 2015-2020
Table JE Dunn Construction Profile
Table JE Dunn Construction Product Introduction
Figure JE Dunn Construction Production and Growth Rate
Figure JE Dunn Construction Value ($) Market Share 2015-2020
Table DPR Construction Profile
Table DPR Construction Product Introduction
Figure DPR Construction Production and Growth Rate
Figure DPR Construction Value ($) Market Share 2015-2020
Table Equinix Profile
Table Equinix Product Introduction
Figure Equinix Production and Growth Rate
Figure Equinix Value ($) Market Share 2015-2020
Table Holder Construction Company Profile
Table Holder Construction Company Product Introduction
Figure Holder Construction Company Production and Growth Rate
Figure Holder Construction Company Value ($) Market Share 2015-2020
Table Market Driving Factors of Data Center Construction
Table Merger, Acquisition and New Investment
Table Global Data Center Construction Market Value ($) Forecast, by Type
Table Global Data Center Construction Market Volume Forecast, by Type
Figure Global Data Center Construction Market Value ($) and Growth Rate Forecast of Electrical Construction (2020-2025)
Figure Global Data Center Construction Market Volume ($) and Growth Rate Forecast of Electrical Construction (2020-2025)
Figure Global Data Center Construction Market Value ($) and Growth Rate Forecast of Mechanical Construction (2020-2025)
Figure Global Data Center Construction Market Volume ($) and Growth Rate Forecast of Mechanical Construction (2020-2025)
Figure Global Data Center Construction Market Value ($) and Growth Rate Forecast of General Construction (2020-2025)
Figure Global Data Center Construction Market Volume ($) and Growth Rate Forecast of General Construction (2020-2025)
Table Global Market Value ($) Forecast by Application (2020-2025)
Table Global Market Volume Forecast by Application (2020-2025)
Figure Market Value ($) and Growth Rate Forecast of Finance (2020-2025)
Figure Market Volume and Growth Rate Forecast of Finance (2020-2025)
Figure Market Value ($) and Growth Rate Forecast of Internet (2020-2025)
Figure Market Volume and Growth Rate Forecast of Internet (2020-2025)
Figure Market Value ($) and Growth Rate Forecast of Telecommunications (2020-2025)
Figure Market Volume and Growth Rate Forecast of Telecommunications (2020-2025)
Figure Market Value ($) and Growth Rate Forecast of Government (2020-2025)
Figure Market Volume and Growth Rate Forecast of Government (2020-2025)
Figure Market Value ($) and Growth Rate Forecast of Others (2020-2025)
Figure Market Volume and Growth Rate Forecast of Others (2020-2025)
Figure North America Market Value ($) and Growth Rate Forecast (2020-2025)
Figure North America Consumption and Growth Rate Forecast (2020-2025)
Figure Europe Market Value ($) and Growth Rate Forecast (2020-2025)
Figure Europe Consumption and Growth Rate Forecast (2020-2025)
Figure Asia Pacific Market Value ($) and Growth Rate Forecast (2020-2025)
Figure Asia Pacific Consumption and Growth Rate Forecast (2020-2025)
Figure Middle East and Africa Market Value ($) and Growth Rate Forecast (2020-2025)
Figure Middle East and Africa Consumption and Growth Rate Forecast (2020-2025)
Figure South America Market Value ($) and Growth Rate Forecast (2020-2025)
Figure South America Consumption and Growth Rate Forecast (2020-2025)
Figure Porter’s Five Forces Analysis
Table New Entrants SWOT Analysis
Table New Project Analysis of Investment Recovery
Methodology/Research Approach
This research study involved the extensive usage of both primary and secondary data sources. The research process involved the study of various factors affecting the industry, including the government policy, market environment, competitive landscape, historical data, present trends in the market, technological innovation, upcoming technologies and the technical progress in related industry, and market risks, opportunities, market barriers and challenges. The following illustrative figure shows the market research methodology applied in this report.Research Programs/Design
Historical Data (2015-2019) |
|
|
Influencing Factors |
|
|
Market Forecast (2021-2026) |
|
|
Market Size Estimation
Top-down and bottom-up approaches are used to validate the global Voluntary Carbon Offset market size market and estimate the market size for Company, regions segments, product segments and Application (end users).
The market estimations in this report are based on the marketed sale price of Voluntary Carbon Offset (excluding any discounts provided by the player, distributor, wholesaler or traders). The percentage splits, market share, and breakdowns of the product segments are derived on the basis of weights assigned to each of the segments on the basis of their utilization rate and average sale price. The regional splits of the overall Voluntary Carbon Offset market and its sub-segments are based on the percentage adoption or utilization of the given product in the respective region or country.
Major Company in the market is identified through secondary research and their market revenues determined through primary and secondary research. Secondary research included the research of the annual and financial reports of the top Company; whereas, primary research included extensive interviews of key opinion leaders and industry experts such as experienced front-line staff, directors, CEOs and marketing executives. The percentage splits, market share, Growth Rate and breakdowns of the product markets are determined through using secondary sources and verified through the primary sources.
All possible factors that influence the markets included in this research study have been accounted for, viewed in extensive detail, verified through primary research, and analyzed to get the final quantitative and qualitative data. The market size for top-level markets and sub-segments is normalized, and the effect of inflation, economic downturns, and regulatory & policy changes or other factors are not accounted for in the market forecast. This data is combined and added with detailed inputs and analysis from Market Intellix and presented in this report
The following figure shows an illustrative representation of the overall market size estimation process used for this study.
Market Breakdown and Data Triangulation
After complete market engineering with calculations for market statistics; market size estimations; market forecasting; market breakdown; and data triangulation, extensive primary research was conducted to gather information and verify and validate the critical numbers arrived at. In the complete market engineering process, both top-down and bottom-up approaches were extensively used, along with several data triangulation methods, to perform market estimation and market forecasting for the overall market segments and sub-segments listed in this report. Extensive qualitative and further quantitative analysis is also done from all the numbers arrived at in the complete market engineering process to list key information throughout the report.
Data Source
Secondary Sources
Secondary sources include such as press releases, annual reports, non-profit organizations, industry associations, governmental agencies and customs data, etc. This research study involves the usage of widespread secondary sources, directories, databases such as Bloomberg Business, Wind Info, Hoovers, Factiva (Dow Jones & Company), and TRADING ECONOMICS, and News Network, statista, Federal Reserve Economic Data, annual reports, BIS Statistics, ICIS; company house documents; CAS(American Chemical Society); investor presentations; and SEC filings of companies. Secondary research was used to identify and collect information useful for the extensive, technical, market-oriented, and Hospitals study of the Voluntary Carbon Offset market. It was also used to obtain important information about the top companies, market classification and segmentation according to industry trends to the bottom-most level, and key developments related to market and technology perspectives.
Market Size |
|
|
Market Position of Top Company |
|
|
Qualitative Analysis |
|
|
Primary Sources
In the primary research process, various sources from both the supply and demand sides were interviewed to obtain qualitative and quantitative information for this report. The primary sources from the supply side include product Company (and their competitors), opinion leaders, industry experts, research institutions, distributors, dealer and traders, as well as the raw materials suppliers and producers, etc.
The primary sources from the demand side include industry experts such as business leaders, marketing and sales directors, technology and innovation directors, supply chain executive, end use (product buyers), and related key executives from various key companies and organizations operating in the global market.
Primary research was conducted to identify segmentation Type, product price range, product Application, key Company, raw materials supply and the downstream demand, industry status and outlook, and key market dynamics such as risks, influence factors, opportunities, market barriers, industry trends, and key player strategies.
Key Executives Interviewed
Key Data Information from Primary Sources
Primary Sources | Parameters | Key Data |
Market Segments(by Application, by Type) |
|
|
Total Market |
|
|